Project Larivot Bridge
There are times when we must replace artwork because of degradation and the same applies for bridges. At Larivot’s Bridge, the replacement of the secondary maintenance and pipeline support gangway was a necessary task given its advanced state of degradation.
Slefty has been working on structural analysis to come up with a replacement solution for the bridge, considering the several constraints on site and the difficulty of intervention due to the proximity to the water. The new structure would have to be able to withstand the new loads and be installed with the bridge in operation.
The analysis of bridges, viaducts or walkways, whether new or to replace is something that Slefty can do. We have always the best solution.